CAPEX and OPEX analysis grounded in engineering reality.
Investment economics are only as reliable as the technical assumptions behind the cost model. 3EH traces material costs back to equipment, capacity, utilities, labor, maintenance and operating conditions.
CAPEX
Equipment, installation, civil works, infrastructure, engineering, commissioning, contingency and hidden scope.
OPEX
Energy, labor, consumables, maintenance, waste, logistics, downtime and overhead.
Sensitivity
Which variables drive NPV, IRR, payback and downside exposure?
Do the cost assumptions survive engineering review?
Send the model, quotations or project assumptions.